Tech Wavo
  • Home
  • Technology
  • Computers
  • Gadgets
  • Mobile
  • Apps
  • News
  • Financial
  • Stock
Tech Wavo
No Result
View All Result

Cable Laying Begins Marking Key Milestone for Celtic Interconnector Project

Tech Wavo by Tech Wavo
August 10, 2025
in Technology
0



Cable Laying Begins Marking Key Milestone for Celtic Interconnector Project

A landmark moment was reached this week on the Celtic Interconnector project, as laying of the submarine cable commenced on the key energy project linking the electricity grids of Ireland and France.

The next phase of the project was signalled by the arrival of the specialist marine vessel Calypso, which will lay the high voltage direct current (HVDC) cable for the project, which is being developed with EirGrid and its French equivalent, Réseau de Transport d’Electricité (RTE) and co-funded by the EU Connecting Europe Fund.

When complete, it will be the first interconnector between Ireland and continental Europe, travelling from east Cork to the north-west coast of Brittany.

The vessel, which arrived from Norway into the Port of Cork, has started the cable laying along an 84km section of the route. When fully complete, the HVDC cable will span 500km from east Cork to the north-west of Brittany and will allow the exchange of 700MW of electricity, equal to powering 450,000 homes.

The cable is being laid onto the seabed by the Calypso, with burial works done by two further vessels.

Cable Laying Begins Marking Key Milestone for Celtic Interconnector Project

The HVDC cable is currently being laid along an 84km section of the Celtic Interconnector route.

The cable lay and burial operations are weather sensitive and are being carried out in summer, to align with the best weather conditions. Marine survey teams have mapped the seabed in advance of works to chart the optimal route for the cable, with EirGrid liaising with local fisheries and marine users throughout.

Speaking about the marine campaign, Michael Behan said: “EirGrid is proud to welcome this latest phase of works on the Celtic Interconnector project, which really shows the progress being made on this key energy project for Ireland. This feat of engineering that will take place over the coming weeks is a testament to the collaboration, innovation and care required to deliver this critical infrastructure. We remain grateful for the continued patience and support of communities, landowners, and stakeholders as we progress this project.”

The cable laying installation is just one element of this strategic infrastructure project being developed by EirGrid and its French counterpart, Réseau de Transport d’Électricité (RTE). The project’s onshore phase has seen approximately 10km of high voltage alternating current (HVAC) cable installed in roads, with HVDC cabling works currently being progressed.

Meanwhile, civil works at the project’s converter station, located at Ballyadam, near Carrigtwohill, are near completion, with internal fitouts of the converter hall progressing well.





Source_link

Previous Post

How to pitch like a pro — lessons from a ‘Shark Tank’ insider

Next Post

Disney Scraps Deepfake Dwayne Johnson After Lawyers Panic About The Public Domain

Next Post
This Week In Techdirt History: August 3rd – 9th

Disney Scraps Deepfake Dwayne Johnson After Lawyers Panic About The Public Domain

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Another iPhone 17 price leak has appeared – and it’s not good news ahead of Tuesday’s Apple event

by Tech Wavo
September 5, 2025
0
Another iPhone 17 price leak has appeared – and it’s not good news ahead of Tuesday’s Apple event
Computers

iPhone 17 pricing has again been predictedMost models are likely to see a price riseThe iPhone 17 may cost the...

Read more

World Cup 2026 Qualifier Soccer: Stream Brazil vs. Chile Live From Anywhere for Free

by Tech Wavo
September 5, 2025
0
World Cup 2026 Qualifier Soccer: Stream Brazil vs. Chile Live From Anywhere for Free
Mobile

61% off with 2yr plan (+4 free months) See more details See at SBS Showing Ecuador vs. Brazil in Australia...

Read more

Repairing A Tektronix 577 Curve Tracer

by Tech Wavo
September 5, 2025
0
Repairing A Tektronix 577 Curve Tracer
Technology

Over on his YouTube channel our hacker repairs a Tektronix 577 curve tracer. A curve tracer is a piece of...

Read more

Phishing emails are getting smarter – and using some new tricks to snare victims

by Tech Wavo
September 5, 2025
0
Smarter than the scam: how optimized AI is reshaping fraud detection
Computers

Barracuda says Tycoon now offers new ways to hide malicious links in emailsURL encoding, fake CAPTCHAs, domain splits, and other...

Read more

Site links

  • Home
  • About Us
  • Contact Us
  • Privacy Policy
  • Terms of use
  • Home
  • About Us
  • Contact Us
  • Privacy Policy
  • Terms of use

No Result
View All Result
  • Home
  • Technology
  • Computers
  • Gadgets
  • Mobile
  • Apps
  • News
  • Financial
  • Stock